OtherFree Download

Saudi Aramco GI 2.718 CONTRACTOR SITE ALLOTMENT PROCEDURE

PDF
Nov 28, 2025
0 downloads
Download DocumentPDF

Verified Safe

Professional

Industry Standard

About This Document

This document is the Saudi Aramco General Instruction Manual GI 2.718, detailing the Contractor Site Allotment Procedure. It outlines the comprehensive process for establishing contractor camps, offices, storage areas, waste disposal/treatment sites, and laydown yards within Saudi Aramco reservations.

The procedure covers crucial aspects such as site application requirements, responsibilities of involved parties including the proponent department, Projects Review & Coordination Division (PR&CD), Facilities Planning Department (FPD), Environmental Protection Department (EPD), and Loss Prevention Superintendent. It also specifies location drawing requirements, approval authorities, the application form process, and the critical site recovery procedures upon contract termination.

The document emphasizes the need for strict adherence to Saudi Aramco's safety and environmental standards, ensuring all contractor facilities are temporary and properly decommissioned. This procedure is essential for maintaining operational integrity, safety, and environmental compliance within Saudi Aramco's operational areas.

Ideal for project managers, HSE officers, site administrators, and procurement specialists working in the oil and gas industry, particularly those engaged with Saudi Aramco projects.