OtherFree Download

Saudi Aramco GI 1400.001 NON-ELECTRIC UTILITIES PROCEDURES FOR CONNECTION DISCONNECTION

PDF
Nov 28, 2025
0 downloads
Download DocumentPDF

Verified Safe

Professional

Industry Standard

About This Document

This Saudi Aramco General Instruction (GI) 1400.001 outlines the comprehensive procedures for connecting and disconnecting non-electric utilities within Saudi Aramco communities. It details the rules and regulations governing modifications to existing or the establishment of new connections for critical utilities including drinking water, raw water, wastewater, tertiary water, chilled water, and fuel gas distribution systems.

The document covers essential definitions, defines responsibilities for proponents and the Utilities Department (UD), and lays out procedural matters, including the use of SA Form 9678 for utility requests and disconnections. It specifies the approval processes for design drawings, flow calculations, and any subsequent design changes or revisions.

This instruction is crucial for managing the integration and removal of non-electric utility infrastructure, ensuring proper planning, capacity assessment, and adherence to Saudi Aramco standards for all projects of any magnitude, excluding industrial locations. Readers will gain a clear understanding of the required steps, documentation, and approvals needed for utility connections and disconnections, ensuring compliance and efficient infrastructure management.

Ideal for project managers, utility engineers, design engineers, and HSE coordinators working in Saudi Aramco or similar large industrial organizations.