OtherFree Download

Saudi Aramco GI 2.600 PLANTUNIT ACCEPTANCE AFTER T & I SHUTDOWN

PDF
Nov 28, 2025
0 downloads
Download DocumentPDF

Verified Safe

Professional

Industry Standard

About This Document

This official Saudi Aramco General Instruction Manual (GI 2.600) details the critical procedures and conditions for plant and unit acceptance following a Turnaround and Inspection (T&I) shutdown. It comprehensively covers the process of reintroducing facilities into service, ensuring they meet stringent safety and operational standards.

The document outlines the formation and responsibilities of the Acceptance Committee, emphasizing the roles of Operations, Maintenance, and Inspection departments. Key content includes the acceptance criteria for both major and minor units, requirements for the T&I Acceptance Report (Saudi Aramco Form 3060), and procedures for managing exceptions.

Furthermore, it specifies conditions for tightness testing, a crucial step in verifying system integrity before restart, and the necessary documentation and approvals. This guide is essential for maintaining operational readiness and safety within Saudi Aramco's facilities.

Ideal for HSE Coordinators, Inspection Engineers, Operations Superintendents, and Maintenance Supervisors working in the oil and gas industry.